10: 1–2 tons (page also describes heavy-debris configs up to 10 tons) · 20: 2–4 tons · 40: 5–8 tons
Included days
10 days
Overage fee
—
Extra-day fee
—
Local Hauler means the company runs its own trucks. Broker means they send another company’s truck. A dash means that size or fee was not on their published rate. Call for quote means they did not publish a price for any size.
Street and driveway permit
Driveway
No City of Dallas right-of-way permit was found for a container placed entirely on private property (driveway or private lot).
Street / right-of-way
A Traffic Control Permit from Transportation & Public Works is required if work or placement will close a traffic lane or block a sidewalk or alley.
Official permit
Traffic Control Permit (and, for construction work in the public right-of-way, a Right-of-Way Permit)
Issuing department
City of Dallas Transportation & Public Works — Right-of-Way Management
Fee
Check city portal. Apply through the Right-of-Way Permit Management System at
Lead time
—
Plain English
Place the container on a private driveway or lot whenever possible; that does not require a City of Dallas ROW permit on the official pages reviewed. If a container or related work would close a traffic lane or block a sidewalk or alley, Dallas requires a Traffic Control Permit from Transportation & Public Works, with a traffic control plan submitted through the Right-of-Way Permit Management System. Separately, private waste haulers must hold a City Council-granted solid waste collection franchise to operate in Dallas (