LocalDumpsterRates

Planner · not a quote

What size, and what it will weigh.

The box that looks big enough can still blow the included tons. Use this to pick a starting size, then read the tons column on a city page before you book.

These are material-weight planning ranges. They are not local prices, not included tons, and not a hauler’s fee.

Project estimator

Garage cleanout

Start with10 or 20 yard
Typical weightOften about 1–2 tons of mixed household junk.

Boxes, furniture, and old tools usually fill the box before they reach a typical weight cap. Tile, bagged concrete, and dirt do the opposite. Keep those out, or tell the hauler before delivery.

Roof tear-off

Start with10 or 20 yard
Typical weightAsphalt shingles are roughly 200–350 pounds per roofing square (100 sq ft). A 20-square tear-off is on the order of 2–3.5 tons of shingles, before underlayment.

Heavy-debris warning. Heavy debris. The box often hits the included tons while it still looks half empty. Price the tonnage, not the air space.

A bigger box does not raise the weight cap. Ask the included tons for the size you book, and ask whether a roofing load is priced differently from household junk.

Kitchen remodel

Start with10 or 20 yard
Typical weightCabinets and drywall are bulky. A single kitchen is often in the 1–3 ton range until tile, plaster, or a stone counter goes in.

Heavy-debris warning. Tile, plaster, and stone are heavy debris. They can double the weight of an otherwise ordinary kitchen load.

If the floor is tile on a mortar bed, treat it like heavy debris and ask before you order a 30 or 40. Volume is not the constraint.

Deck removal

Start with10 or 20 yard
Typical weightLumber from a modest deck is bulky and usually lighter than roofing. Plan on roughly 1–2 tons unless concrete footings are included.

Heavy-debris warning. Concrete footings are heavy debris. Pull them out of the load, or tell the hauler they are in the box.

A 20 yard is usually enough board footage for a residential deck. Long joists waste space if they are not cut down. Weight stays modest as long as the concrete stays out.

Heavy concrete or dirt

Start with10 yard, and only if the hauler accepts the material
Typical weightSolid concrete is about 2 tons per cubic yard (around 4,000 pounds). Dirt is commonly about 1–1.5 tons per cubic yard, and more when it is wet.

Heavy-debris warning. Do not order a 20, 30, or 40 for dirt or concrete unless the hauler says that material is allowed in that size. A 10-yard box of concrete can weigh around 10 tons. Overage, or a rejected load, costs more than the bigger box would have saved.

Many haulers price dirt and concrete as their own load, with a lower fill line. If the overage cell on a city page is a dash, the source did not publish a fee. Call and ask. This estimator is not that fee.

Then check a sourced city